All pages
Powered by GitBook
1 of 21

Loading...

Loading...

Loading...

Loading...

Loading...

Loading...

Loading...

Loading...

Loading...

Loading...

Loading...

Loading...

Loading...

Loading...

Loading...

Loading...

Loading...

Loading...

Loading...

Loading...

Loading...

Migration from v1.3 to v1.4

The HCM v1.4 release requires migration of the boundary and MDMS data if the server is not a fresh deployment but an existing v1.3 deployment

Boundary v2 migration

If the current environment has boundary data in MDMS v1 please follow the steps mention in the document below to migrate to boundary v2. Boundary migration from v1 to v2 LTS

MDMS v2 migration

If the environment is new the one click installer and data loader will by default load the data required.

If the Environment has pre existing data then the MDMS v2 migration tool should be run using the below document:

Following is the code link:

MDMS migration from v1 to V2 LTS
Code link for the above-mentioned migration utilities

Introducing Health

Mission

Help countries achieve Health SDGs by building digital public goods that strengthen public health.

What are public health campaigns?

Health risks such as infectious diseases generally cannot be addressed at the individual and health worker levels alone. They require intervention at the policy level. This is where public health campaigns come into the picture.

Public health campaigns are specific, time-bound health services that respond to particular challenges and are provided to a target population by dedicated campaign workers. Such campaigns can influence perceptions, attitudes, and behaviors to achieve the desired goal. They can prevent or respond to disease outbreaks, control or eliminate targeted diseases, or achieve other health objectives. According to the World Health Organisation (WHO), two strains of wild poliovirus have “officially been certified as globally eradicated,” and immunisation campaigns have played a key role in this. Over the years campaigns to fight malaria, AIDS and other diseases have not only improved the lives of millions of people in poor and developing countries and disadvantaged communities, but it has also enabled them to lead more productive lives.

In 2019, 534 campaigns were tracked globally, providing vaccines, drugs, vitamins, and preventative tools for malaria, malnutrition, measles, meningitis, NTDs, polio, tetanus, typhoid, and yellow fever. However, by the end of 2020, an estimated 50% of the public health campaigns were postponed, suspended, or canceled due to the COVID-19 pandemic. This left millions of people and children at risk of vaccine-preventable diseases and malnutrition.

How can HCM help?

As health campaigns catch up on missed vaccinations, drugs, and other preventative measures globally, there is an opportunity to reimagine the way countries can plan and implement campaigns through open-source digital platforms.

Today, digital tools are either free but not fit for purpose, or they do the job but cost a fortune due to repetitive work adding to the costs. Data is locked in silos and there is no operability between systems. These tools are also difficult to sustain and scale. These realities made it clear that isolated approaches cannot do the job.

Health campaigns require a holistic digital transformation. Health Campaign Management, or HCM, was developed to address these challenges effectively.

HCM is a free, fit-for-purpose, open-source, end-to-end health campaign digitisation product. It covers campaign setup, planning, registration, service delivery, inventory management, and real-time data dashboards, enabling faster and cost-effective health campaigns. HCM is designed to evolve rapidly and adapt to local needs while addressing systemic challenges.

With HCM, all programmes — whether for polio, malaria, or measles — are unified under a single, streamlined interface. This ensures data flows seamlessly across different modules, improving data quality and accessibility.

The shared data repository within HCM guarantees a “single source of truth,” maintaining high data quality. It offers easy integrations and seamlessly operates with open-source products, providing a unified system for health campaign management.

HCM is designed with highly configurable, reusable modular building blocks, enabling rapid reconfiguration of the same product for different health campaigns. These modules can also be repurposed to develop new solutions for routine health, primary healthcare, and other areas.

More than just a product, HCM is a comprehensive solution designed to streamline health campaigns, enhance coordination, and improve outcomes at every level of the health campaign management system.

Useful Links

Contact Us

Migration from v1.5 to v1.6

The HCM v1.6 release does not require any migration from the 1.5 release.

Release Notes

Health Campaign Management

Overview of public health campaign challenges resolved by DIGIT HCM

Health Products

The different modules and features of the Frontline Worker's App, the Campaign Management Dashboard, Microplanning, and HCM Admin Console

Setup

Plan, gather requirements, install and configure HCM

Master Data Management Service (MDMS) & Configuration Updates

MDMS

v1.3 Tech Release Summary

Impacted Services

Project:

  • Implemented validation for updating the project start date and the end date. Implementing this ensures that any changes made to these critical campaigns adhere to the predefined criteria.

  • Added the number of sessions field in additional details for the attendance registry, which enhances the system's ability to manage attendance tracking within projects. This field specifically denotes the frequency of attendance-taking sessions for a given project. Each session represents an instance where attendance is recorded, typically within a single day. For instance, if a project requires attendance twice daily (for example, morning and afternoon sessions), the number of sessions field would indicate ‘2’ to reflect this frequency. This information provides crucial context for understanding the attendance requirements and scheduling patterns within the project.

Individual:

  • Added the ability to search by user UUID (Universally Unique Identifier) for individual search. This addition expands the search capabilities within the DIGIT-HCM platform, providing users with a more versatile and efficient means of locating specific individuals. A UUID is a unique identifier assigned to each user within the system. This new feature allows users to quickly retrieve information about a particular individual by entering their UUID into the search functionality. By leveraging UUIDs, which ensure each user has a distinct identifier, the search process becomes highly precise and reliable, minimising the risk of ambiguity or confusion, particularly in large datasets.

Referral Management:

Health Facility Referral Feature Update

New Feature: HF Referral

DIGIT-HCM now includes a Health Facility Referral (HF Referral) functionality that enhances the platform’s capability to efficiently manage referrals across health facilities. This addition is aimed at improving coordination and communication, ensuring a smoother referral process.

Stock Registry:

Enhance the inventory flow with the sender ID and the receiver ID added. Including sender and receiver IDs offers flexibility in handling inventory transactions within the DIGIT-HCM platform. Transactions can involve movement between warehouses, from warehouse to staff, from staff to staff, or any combination thereof. This accommodates various scenarios, such as inter-departmental transfers, internal requisitions, or supplier deliveries.

  1. Sender Identification: The sender ID specifies the entity initiating the inventory transaction. This could be a warehouse, indicating that inventory items are being dispatched from a specific storage location. Alternatively, it could represent an individual staff member responsible for authorising the transfer of inventory items.

  2. Receiver Identification: The receiver ID denotes the entity or individual receiving the inventory items. Similar to the sender ID, this could represent either a warehouse where the items are being delivered or an individual staff member who is the designated recipient.

Attendance:

Implemented offline-enabled functionality in the Attendance Module. Implementing this functionality in the attendance module significantly enhances the usability and reliability of the DIGIT-HCM platform, especially in environments where internet connectivity may be intermittent or unavailable.

Migration from v1.4 to v1.5

The HCM v1.5 release does not require any migration from the 1.4 release.

Role action Mapping Service register

Config

Feature

Service name

PR

Health Facility Referral

referral

​,​

Attendance

Devops

Feature

Service name

PR

Attendance Session Configuration

​Attendance

​attendance-sessions.json

Service Build Updates

Find the service build updates below:

Category (Tag)

Services

Docker Artifact ID

Remarks

Facility

egovio/facility-db:v1.1.2-00a7accbda-14

Not Changed

Household

egovio/household-db:v1.1.4-a0e714254c-30

Changed

v1.3 Release Notes

Release Summary

Health Campaign Management v1.3: The Frontline Worker’s App includes two new features that enable frontline teams to perform their tasks efficiently even when offline.

To learn more about the DIGIT Health Platform and the Health Campaign Management (HCM) product, click .

1.3 UAT PR
Persister
Indexer
Persister
attendance

Individual

egovio/individual-db:v1.1.6-a0e714254c-12

Changed

Project

egovio/project-db:v1.1.5-a0e714254c-13

Changed

Product

egovio/product-db:v1.1.0-00a7accbda-31

Not Changed

Referral Management

egovio/referralmanagement-db:v1.0.3-a0e714254c-42

Changed

Stock

egovio/stock-db:v1.1.3-a0e714254c-31

Changed

Transformer

transformer:HDDF-1277-2f487e8dc5-256

Changed

HRMS

egovio/egov-hrms-db:v1.2.7-00a7accbda-19

Not Changed

Pgr

egovio/pgr-services-db:v1.1.7-00a7accbda-19

Not Changed

Service-request

egovio/service-request-db:v1.0.1-a0e714254c-18

Changed

Health-attendance

egovio/health-attendance-db:v1.0.2-30824c427-11

Not Changed

HCM-v1.5

Digit-Ui

egovio/digit-ui:health-dashboard-digit-ui-d216162056-686

Changed

Health-UI

health-ui:health-dashboard-product-5bd3650bf2-691

Changed

DIGIT-2.9-LTS

Core service build list

Not Changed

Dashboard

egovio/dss-dashboard:v1.8.0-0d70d60e63-53

Unchanged

egovio/dashboard-analytics:master-impel-f705ac483a-48

Unchnaged

egovio/dashboard-ingest:v1.1.4-72f8a8f87b-10

Unchnaged

Console v0.2

Project-factory

egovio/project-factory:v0.2.0-1ea8b5b5b9-9

Changed

UI

egovio/workbench-ui:v0.2.0-6f08f64238-535

Changed

Configs

HCM v1.5 Release chart
HCM-v1.5
New Feature Additions

Module

Functionality

Attendance Management

This is an offline-first module that allows supervisors who mark attendance for their teams to record their proof of work based on which the on-field workers will get paid.

The Attendance Module supports single-session and double-session attendance marking based on the cadence followed by the programme team.

Health Facility Referral

This is an offline-first feature that allows workers working at a given health facility (HF) who will be responsible for giving the diagnosis based on the type of symptoms they observe, then make a diagnosis, and provide the appropriate drugs.

This module provides the health facility workers with the capability to track referrals made by on-field health workers to different health facilities digitally via the Digit HCM app capturing all the cases of:

  1. Beneficiary being referred

  2. Referral details of the beneficiary

  3. Reason for referrals and their diagnosis

Localisation Keys

​Release kit Link

here

HCM v1.5 Release Notes

Release Summary

HCM v1.5 is a product release with upgrades for a new campaign adaptation such as IRS.

Features:

  • Enhancement of DIGIT HCM for managing a new campaign such as IRS.

  • Enhancement to provide the ability to link downloaded households to new campaigns.

  • The product has been enhanced to capture information related to house structure, room details, and the number of pregnant women and children present in the house independent of the campaign type.

  • Enhanced accuracy for geo coordinates capture in the app.

  • Enhancement of DSS dashboards for new campaign adaption.

  • Enhancement to provide the ability to view dashboards for District Supervisors in the mobile application.

Functional Changes

  • Closed Household: This feature enables data collection on closed households by utilizing the existing registration and delivery package. It allows CDDs (Community Drug Distributors) to revisit households for registry updates efficiently.

  • Registration and Delivery: Added intermediate screens to enhance registration of households to support new campaigns.

  • User Action: Full CRUD functionality for project-related actions taken by the field worker that are not tasks related to the beneficiary like:

Non-Functional Changes

  • Pop-ups have been added to various screens to improve geo-coordinate accuracy within the app. These pop-ups will display a message and temporarily freeze the screen, allowing users to capture a person's geo-coordinates without disruption.

Breaking Changes

  • No breaking changes were made.

Benefits - v1.5

  • Configurable Project Dashboard: Previously, project dashboard configurations were hardcoded. Now, they are fully configurable based on boundary v2 and project-type codes.

  • Removal of Hardcoded Context Paths: All hardcoded context paths have been removed throughout the application, improving flexibility and maintainability.

  • Map Config Data Moved to S3: Due to the large size of the map configuration data, it could not be loaded into MDMS v2. This data has now been moved to S3 assets for better handling and storage.

v1.2 Release Notes

Release Summary

Health Campaign Management v1.2: The frontline worker’s App includes 8 new features that allow the frontline teams to perform their tasks efficiently even when offline.

New Feature Additions

Test Cases

HCM Test Cases v1.3

Refusal of consent for data collection.

  • Scanning of resources that will be reused for multiple deliveries.

  • Marking a transit post-non-compliant (polio).

  • Marking any incident that doesn't bear relation to the beneficiary.

  • Location capture of the field worker app.

  • Dashboard Updates:

    • Mobile Dashboard: Enabled the mobile dashboard for district supervisors and configured the Digit UI DSS Dashboard to support new campaigns (e.g. IRS).

    • National Dashboard Enhancements: Introduced support for pie charts and bar charts.

    • Map Configurations: Moved map configuration data to S3 assets.

    • Chart Configurations: Added and modified chart configurations for both the Mobile and DSS Dashboards (e.g., IRS), including both new and existing charts.

  • Tech Debts

    • Search Query Optimization: Enhanced search queries across the mobile application for improved performance.

    • Boundary Localizations: Migrated boundary localizations from the ISAR (JSON) database to an SQL database in the mobile application for better efficiency.

  • Search Query Enhancement: Previously, each entity had its own individual search. Now, we have implemented a unified query builder, which has significantly improved the performance of the search functionality.

    Based on the diagnosis chosen, further details, if applicable

    Module

    Functionality

    Registration

    Mobile app that enables the field teams to easily register eligible beneficiaries with built-in checks that enforce data collection protocols and validations to avoid data entry errors. The new features added are:

    • The ability to support voucher-based registration: Users can now scan and link a 2D code voucher to a beneficiary (household or an individual) while registering the beneficiary.

    Service Delivery

    Mobile app to enable the field teams to search for eligible beneficiaries and deliver the healthcare intervention with built in checks that enforce data collection protocols and validations to avoid data entry errors.

    • Ability to search registered beneficiaries and deliver benefits (products/services) for a multi round campaign- Supporting the following use cases is now possible:

      • Single Cycle- Single Dose

      • Single Cycle- Multiple Doses

      • Multiple Cycles- Single Dose

      • Multiple Cycle- Multiple Doses

    • Ability to scan and redeem a voucher during distribution.

    • Ability to search and filter the beneficiary list based on proximity: Based on distance of the user from the registered beneficiary.

    • Provide decision support to the use by automatically calculating the number of benefits to be delivered based on configured formula.

    • Ability to track and record side effects for a campaign beneficiary post resource delivery.

    • Ability to track and manage beneficiary referrals.

    • Automated eligibility check for campaign beneficiary: Based on configured parameters, the application determines in the registered individual is eligible for the campaign.

    Inventory Management

    Mobile app that enables the field staff to capture inflow and outflow of resources received from the warehouse or the supervisors.

    • Last-mile tracking of resources is now possible and programme supervisors have visibility of stock movement across the supply chain.

    • The ability to record stock received from the warehouse/ supervisor as well as issue to other frontline teams.

    • The ability to record stocks that were lost and damaged during field operations.

    Sync

    • Users can now download and reuse beneficiary data synced by other users for one or more boundaries.

    Service Build Updates

    Find the service build updates below:

    Category (Tag)

    Services

    Docker Artifact ID

    Remarks

    Facility

    egovio/facility-db:v1.1.2-00a7accbda-14

    Changed

    Household

    egovio/household-db:v1.1.3-00a7accbda-12

    Changed

    v1.0 Release Notes

    Release Summary

    The Health Campaign Management V1.0 frontline worker’s app includes four new modules with several features that allow frontline teams to perform their tasks efficiently even when offline. To learn more about the DIGIT Health Platform and the Health Campaign Management (HCM) product, please follow the GitBook link.

    Release Highlights

    Feature
    Description

    Bug Fixes (Feedback from the bug bash)

    • Click to access the Jira dashboard.

    Known Issues

    • Field 'type' does not exist or this field cannot be viewed by anonymous users.

    • The field 'assignee' does not exist or this field cannot be viewed by anonymous users.

    • A value with ID '10141' does not exist for the field 'project'.

    • Field 'labels' do not exist or this field cannot be viewed by anonymous users.

    Related Documents and Links

    • Click to view the feedback from the UX audit.

    HCM v1.4 Release Notes

    Release Summary

    HCM v1.4 is a tech release with only server upgrade to DIGIT 2.9 LTS with some additional cleanup.

    Features:

    • Digit core LTS integration

      • MDMS v2 integration

      • Boundary V2 integration

    • HCM Admin Console

    • DIGIT HCM app modules as package extractions

    Functional Changes

    • Missing unique validation on client reference ID added in all offline supported services.

    • Project types have been moved to project additional details from MDMS.

    Non-Functional Changes

    • UI modules extracted as packages

      • Registration and delivery

      • Referral reconciliation

      • Inventory management

    Breaking Changes

    • All the master data for the DIGIT HCM app are separated by functionality from one single master.

    • Flyway version upgrade to 9.22.3 for LTS upgrade.

    • Boundary v2 Integration

    Attendance management

  • DIGIT scanner

  • DIGIT showcase

  • All core services have been upgraded to core 2.9 LTS barring the services modified for offline use cases.

  • All data models have been restructured with an "is a relationship" from base eGov model and the base eGov search model.

  • All data models have been moved to the health common library and duplicates removed.

  • Removed reflection until code in the health common library that is Incompatible with Java 9 and above.

  • The field 'priority' does not exist or this field cannot be viewed by anonymous users.

  • Not able to sort using field 'priority'.

  • Registration

    A mobile app that enables the field teams to easily register eligible beneficiaries with built-in checks that enforce data collection protocols and validations to avoid data entry errors. It facilitates the following:

    • Ability to register new beneficiaries (households and individuals) with the beneficiary’s address along with GPS coordinates, personal details (name, date of birth, gender, ID), and contact details.

    • Ability to search existing beneficiaries and update details.

    • Reuse beneficiary data across various health campaigns.

    • Sync registration data collected while offline on connecting to the internet

    Service Delivery

    A mobile app to enable the field teams to search for eligible beneficiaries and deliver the healthcare intervention with built-in checks that enforce data collection protocols and validations to avoid data entry errors. It facilitates the following:

    • Ability to search registered beneficiaries and deliver benefits (products/services) for a single-round campaign.

    • Ability to configure and deliver multiple products to a beneficiary.

    • Provide decision support to the user by automatically calculating the number of benefits to be delivered based on the configured formulae

    • In-app cards with KPI’s to visualise progress against assigned tasks.

    • Sync registration data collected while offline on connecting to the internet.

    Inventory Management

    A mobile app that enables warehouse managers to capture the inflow and outflow of resources from their warehouses to identify potential stockouts, wastage, and fraud, and take corrective action. It facilitates the following:

    • Ability to record stock received into the warehouse as well as issued to other warehouses or frontline teams.

    • Ability to record stocks that were lost and damaged either during storage or during transit.

    • Ability to perform auto-stock reconciliation to provide visibility into available stock on hand.

    • Sync stock records collected while offline on connecting to the internet.

    Supervision (Survey)

    A mobile app that enables supervisors to to track the campaign staff's adherence to the campaign’s standard operating protocols, and record observations after the inspection. It facilitates the following:

    • Ability to configure a checklist with support for the following question types:

    - Yes/no type questions (Radio buttons).

    - Short answer questions (Text box).

    - Long answer questions (Text box).

    - Multiple response questions (Checkbox).

    • Ability to configure basic validations on checklist question.s

    • Sync checklist responses collected while offline on connecting to the internet.

    here
    here

    Individual

    egovio/individual-db:v1.1.5-00a7accbda-6

    Changed

    Project

    egovio/project-db:v1.1.4-00a7accbda-5

    Changed

    Product

    egovio/product-db:v1.1.0-00a7accbda-31

    Not Changed

    Referral Management

    egovio/referralmanagement-db:v1.0.2-00a7accbda-14

    Changed

    Stock

    egovio/stock-db:v1.1.3-00a7accbda-18

    Changed

    Transformer

    egovio/transformer:v1.1.2-00a7accbda-19

    Changed

    HRMS

    egovio/egov-hrms-db:v1.2.7-00a7accbda-19

    Changed

    Pgr

    egovio/pgr-services-db:v1.1.7-00a7accbda-19

    Changed

    Service-request

    egovio/service-request-db:v1.0.0-00a7accbda-16

    Changed

    HCM-v1.4

    Health-attendance

    egovio/health-attendance-db:v1.0.2-30824c427-11

    Changed

    HCM-v1.4

    Digit-Ui

    egovio/digit-ui:health-dashboard-product-3cb11409c9-636

    DIGIT-2.9-LTS

    Core service build list

    Changed

    Dashboard

    egovio/dss-dashboard:v1.8.0-0d70d60e63-53

    Unchanged

    egovio/dashboard-analytics:master-impel-f705ac483a-48

    Unchnaged

    egovio/dashboard-ingest:v1.1.4-72f8a8f87b-10

    Unchnaged

    Console v0.1

    Project-factory

    egovio/project-factory:v0.1.0-6caaf2700e-6

    Changed

    UI

    egovio/workbench-ui:v0.1.0-6caaf2700e-16

    Changed

    Configs

    HCM v1.4 Release chart
    Health v1.4

    Service Build Updates

    Find the service build updates below:

    Individual

    egovio/individual-db:v1.1.6-a0e714254c-12

    Changed

    Project

    egovio/project-db:v1.1.5-a0e714254c-13

    Changed

    Product

    egovio/product-db:v1.1.0-00a7accbda-31

    Not Changed

    Referral Management

    egovio/referralmanagement-db:v1.0.3-a0e714254c-42

    Changed

    Stock

    egovio/stock-db:v1.1.3-a0e714254c-31

    Changed

    Transformer

    egovio/transformer:HDDF-1277-149f70deb7-302

    Changed

    HRMS

    egovio/egov-hrms-db:v1.2.7-00a7accbda-19

    Not Changed

    Pgr

    egovio/pgr-services-db:v1.1.7-00a7accbda-19

    Not Changed

    Service-request

    egovio/service-request-db:v1.0.1-a0e714254c-18

    Changed

    Health-attendance

    egovio/health-attendance-db:v1.0.2-30824c427-11

    Not Changed

    Digit-Ui

    egovio/digit-ui:health-dashboard-digit-ui-921afc69c7-758

    Changed

    Health-UI

    egovio/health-ui:health-dashboard-product-fb65c5f500-759

    Changed

    Not Changed

    Dashboard

    egovio/dss-dashboard:v1.8.0-0d70d60e63-53

    Unchanged

    egovio/dashboard-analytics:analytics-es8-auth-09e437f9f6-67

    Changed

    egovio/dashboard-ingest:v1.1.4-72f8a8f87b-10

    Unchanged

    egovio/project-factory:v0.3.0-c9f5d73e13-233

    Changed

    egovio/workbench-ui:v0.3.0-b3c48dc663-701

    Changed

    plan-service-db:v1.0.0-717aeac28f-231

    resource-generator:v1.0.0-3f860f8a31-29

    census-service:v1.0.0-fd9a00f0e7-77

    HCM v1.6 Release chart

    Category (Tag)

    Services

    Docker Artifact ID

    Remarks

    HCM v1.6

    Facility

    egovio/facility-db:v1.1.2-00a7accbda-14

    Not Changed

    Household

    egovio/household-db:v1.1.4-a0e714254c-30

    Changed

    HCM v1.6 Release Notes

    Overview

    In the HCM 1.6 release, we are excited to introduce several technical improvements and functional enhancements, including two key capabilities:

    1. Micro Planning: This module enables campaign workers to generate precise population estimates and optimize resource allocation, leading to significant time and cost savings in campaign execution.

    2. Admin Console: A streamlined tool for campaign setup, the Admin Console reduces setup time from days to mere minutes, accelerating our ability to support partners across Africa effectively.

    New Capabilities

    1. Microplanning

    Overview:

    It is the process of creating detailed, delivery-level operational plans for reaching target populations with health interventions.

    Microplanning helps to know -

    1. Who needs the intervention?

    2. Where is the intervention site?

    3. How many resources (Medical supply, people, commodities, etc.) are needed for the intervention?

    In the current version of Microplan module, users can:

    • Set up and manage microplan: Set up microplan by ingesting boundary population and facilities or distribution points, managing microplan assumptions for resource calculation, and managing user access.

    • Validate & finalise population data for microplanning: Validate, update, and approve campaign population data to be used for microplan estimations.

    • Assign facilities or distribution points to catchment areas: Assign the facilities to their catchment areas and finalise the assignment.

    • Validate & finalise microplan estimations: Validate, update and approve the microplan estimations to be used for campaign execution.

    Key values delivered:

    1. Enhanced Efficiency: Speeds up the microplanning process by automating calculations and resource estimations, reducing planning time.

    2. Improved Accuracy: Minimizes errors in campaign resource estimates, ensuring optimal allocation.

    3. Real-Time Collaboration: Facilitates real-time data validation and approval among stakeholders, improving coordination.

    4. Scalability: Easily adapts to different campaigns with no or minimal changes.

    Targeted users:

    Central system administrators, program managers, and users that are part of campaign microplanning

    Discovery and validations:

    Multiple validation and process reviewal sessions were conducted with the partners such as CRS, AMP, Malaria consortium, NMCP, CHAI, and WHO. Activities included in the sessions are:

    1. Understanding the workflow of a campaign microplan

    2. Figuring out the key capabilities required in a digital microplan

    3. Product flow walkthrough for validation

    Test yourself:

    Please check out the user-manual .

    Login credentials - Username : MICROADMIN11 Password : eGov@1234

    Value measurement:

    • User feedback from the UAT sessions in Moz

    • Roll-out in other countries and campaigns will further validate the value

    • Measuring the product metric such as time to create a microplan, population coverage accuracy and resource utilization accuracy.

    Key metrics to monitor:

    1. User adoption and engagement

    a. User Registration: The number of microplan users who are registered on the platform.

    b. Session Time: The average amount of time users spend on the platform in minutes.

    1. Population coverage accuracy - The total population considered in the microplan vs the total population captured during the campaign execution.

    2. Resource utilization accuracy - The total number of resources (bednets, frontline workers, vehicles, etc.) estimated during the microplanning phase versus the total number of resources utilised during campaign execution.

    3. Operational efficiency - Time required to finalise a microplan from the created time.

    4. Microplan adoption - The number of microplans created concerning countries.

    Implementation considerations:

    1. Adding a new village (with population data) and running the resource calculation for the village

    2. Adding a new facility, assigning the facility to a village, and then running the estimation service

    3. In some scenarios, a country just wants to use our Microplan product and not the Admin console. In that case, the impel team should be able to consume the Microplan Excel output created by the Microplan v0.1 module and create a Microplan using a script or something.

    4. For Mozambique specifically, the impel team needs to add 3 columns in the estimation dashboard - Fixed monitors, Moving monitors, and Number of days. These will be user input (free text) fields. Add the columns and data points to the finalised microplan estimation Excel report.

    Console

    Overview:

    The Console is a critical module within the HCM platform designed for System Administrators and Programme Managers to efficiently set up, configure, and manage health campaigns. With the Console, users can:

    • Set Up Campaigns: Create campaigns for specific diseases in under three hours.

    • Configure Campaigns: Tailor HCM Mobile App features to align with country-specific needs within a day

    • Manage Campaigns: Update or modify campaign data in real-time to adapt to the how the campaign is evolving

    What the Admin Console Is Not:

    • A module that lets you create new features and data models on HCM

    • A Module that can create new campaign types

    Future Potential:

    • Management Dashboard: A centralized view for organizational leaders to oversee multiple campaigns at a strategic level.

    • Organisational Insights: Provide actionable analytics not just at the campaign level but across the entire organization.

    Key values delivered:

    • Effort Reduction: Simplifies campaign setup, minimizing coordination and manual effort

    • Time Savings: Speeds up the campaign setup process

    • Error Reduction: Decreases the risk of setup errors

    • Lower Technical Barriers: Allows non-technical users to manage campaigns efficiently

    Target users:

    System Administrators, Programme Managers, IT Managers, and non-technical personnel familiar with health campaign workflows.

    Discovery and validations:

    Extensive validations and process reviews were conducted with our partner network. Key activities included:

    • Feedback sessions during online workshops and field visits in Mozambique.

    • Insights from ongoing campaigns, particularly from NMCPs and field users.

    • A webinar showcasing the Admin Console's capabilities is planned.

    Test it yourself:

    1. The Login credentials for the App -

    2. The

    3. The Admin Console link -

    4. Credentials For Console login:

    Value measurement

    • User feedback from UAT sessions with partners and Ministry of Health representatives

    • Usability metrics, such as time taken to set up campaigns and system usability scores

    Key metrics to monitor:

    • Time required by users to set up, configure, and manage campaigns.

    • Feedback from user interviews during and after campaigns

    • Usability lab results to track user efficiency and satisfaction

    Implementation considerations:

    • Localisation: Localizing labels to accommodate country-specific languages and contexts

    Known bugs/Issues

    None

    Enhancements

    HCM dashboard enhancements

    Overview:

    The Seasonal Malaria Chemoprevention (SMC) campaign dashboard within the HCM system has been enhanced to provide greater flexibility, data visualization, and actionable insights. Key improvements include:

    • Pre-Built Dashboards with Customisation: Out-of-the-box dashboards tailored for various campaign types (ITN, SMC, IRS) with the ability to configure custom charts for specific country/program needs using the open-source ElasticSearch Kibana dashboard.

    • Data Evaluation Modules: New features to assess data quality, team performance, and attendance.

    • Expanded Chart Capabilities:

    - Venn diagrams for advanced analysis. For example, in SMC campaigns, these charts help evaluate multi-cycle intervention delivery, such as determining how many beneficiaries received medication across all cycles, one cycle, or specific combinations.

    - Side-by-side comparison charts for multi-dimensional data with more than two bars.

    Key Values Delivered:

    • Customisation Flexibility: Partners and countries can add custom charts to suit specific country requirements integrated into ready-to-use campaign dashboards built in DIGIT’s DSS that have enhanced user experience.

    • Targeted Insights: Enables evaluation of intervention coverage, such as tracking how many individuals received medication across multiple cycles.

    • Advanced Visualisation: Multi-dimensional data analysis through side-by-side charts and Venn diagrams. For example, inventory trends across different supply chain stages or intervention outcomes by region.

    Target users:

    Campaign managers and supervisors are responsible for monitoring and evaluating campaigns daily

    Discovery and validations:

    The enhancements were finalized after discussions with key stakeholders, including the Malaria Consortium, Mozambique NMCP, and feedback from the Digital Product Advisory Committee (DPAC).

    Test it yourself:

    The URL for the dashboard is linked

    The login credentials for the dashboard are linked

    Value measurement:

    Usability and impact assessments will be conducted through planned surveys with end users, including Mozambique NMCP, Malaria Consortium, CRS, and CHAI. The pilot rollout for the SMC campaign in Mozambique’s Nampula and Niassa provinces will further validate these features.

    Key metrics to monitor:

    Implementation considerations:

    • Localisation of labels to align with country-specific contexts and languages.

    • Addition of custom charts not included in the pre-built DSS.

    • Drill-down capabilities for heatmaps rely on the availability of shapefiles for sub-national boundaries (e.g., districts, localities).

    • Customisation of logic for charts in the ‘Data quality’ module logic tailored to program/country needs (e.g., identifying suspected fraud or households exceeding 20 members)

    The framework used for dashboard development: HCM SMC dashboard metrics design:

    Calculations for charts: KPI Calculation: HCM Dashboard SMC:

    Known bugs/issues:

    None

    HCM application enhancements

    Overview:

    The checklist feature in HCM includes a supportive "Help Text" section designed to provide additional guidance for supervisors. This section can be used to clarify the intent of each question or offer useful hints, ensuring that supervisors understand the context and provide accurate responses. By including detailed explanations or examples in the help text, this feature reduces confusion and promotes consistency in data collection, ultimately improving the quality and reliability of the information gathered.

    Key values delivered:

    • Contextual Guidance: Provides additional information to clarify the purpose or context of each question

    • Hints for Accurate Responses: Offers examples or tips to help supervisors choose the correct answers or fill in the required data accurately

    • Improved Data Quality: Reduces errors and inconsistencies by ensuring supervisors fully understand the questions

    • Customisable Content: Allows administrators to tailor the help text for specific questions to suit the campaign or data collection needs

    Targeted users:

    Supervisors who monitor campaign activities, health facilities in charge for assessing the beneficiaries referred, and distributors assessing the eligibility of beneficiaries for service delivery.

    Discovery and validations:

    This feature was developed in collaboration with the Malaria Consortium, with multiple validation sessions conducted to finalize the design. The process included:

    • UI/UX Validation: Assessing the visual design and functionality of the feature

    • User Navigation Walkthrough: Reviewing the user flow to ensure ease of navigation

    • UAT Sessions: Conducting User Acceptance Testing to gather feedback and make improvements

    Value measurement

    • User feedback from UAT with the partners and state team representatives

    • Effectiveness in terms of improvement in the checklist responses to assess the campaign data for the supervision module

    Key metrics to monitor:

    • The time taken by supervisors to complete and submit the checklist

    • Insights gathered from user interviews conducted during and after the campaigns

    • Adoption metrics, including usability scores, to evaluate user efficiency and satisfaction

    Implementation considerations:

    • Localisation of labels to align with country-specific contexts and languages

    • Content customisation to meet implementation requirements

    Conclusion

    Overall Benefits

    Console v0.3

    • Time for campaign configuration for post Intervention flows reduces from 1 week to less than an hour through HCM Admin Console v0.3

    • With the implementation of the edit feature in the HCM Console v0.3, the dependency by partners/country teams on eGov during the campaign was reduced substantially.

    • Campaign Targets (Denominators) for DSS are pushed directly from the target sheet uploaded on the console egov's intervention.

    • All Checklists should be created through the Console with no interventions from the solutions team of eGov.

    SMC App Improvement and Dashboard

    • User Interface enhanced for better user experience

    • New charts such as Venn Diagram and Side by Side multiple bar charts have been added for visualisation of the dashboard.

    Microplanning v0.1

    • Improved Accuracy in Population Data through Micro Planning v0.1.

    • Enhanced Resource Allocation and Efficiency through Micro Planning v0.1

    • Implements robust validation mechanisms, including the ability to approve or reject data updates, fostering trust in the process through Micro Planning v0.1.

    • Improves accountability by maintaining controlled access for various stages of the microplanning process through Micro Planning v0.1.

    Contact Us - eGov FoundationeGov Foundation

    Reusability of Microplans: The frequency with which previous micro plans are reused or adapted for new campaigns.

  • For Mozambique, the user's 9-digit phone number must be validated when uploading the user's Excel file using the user management module.

  • Enhanced Agility: Accommodates last-minute campaign data and app configuration changes without causing delays

    Maximise effectiveness of disease prevention initiatives

    At least 80% of eligible population should receive SPAQ in all cycles of the campaign.

    Triangulate with referrals, refusals, and other ineligibility conditions to assess the reason

    Training Support: Serves as an on-the-go reference tool for supervisors, minimizing the need for extensive pre-training

  • Localized Support: The help text can be written in local languages or customized to fit cultural contexts for better understanding

  • Offers downloadable finalised micro plans in Excel format, simplifying data sharing and usage across stakeholders through Micro Planning v0.1.

  • Ensures better service delivery through precise facility-to-catchment area assignments.

  • SL No

    Metric to Monitor

    Why?

    Target

    Notes

    1

    Number of implementations with customised new charts in Kibana

    Test dashboard configurability

    ≥50% of implementations creates at least one custom chart

    Identify common customizations to integrate generically into DSS.

    2

    System Usability Score (SUS)

    Qualitative feedback of the dashboard enhancements from end users

    >80

    Assess user satisfaction and ease of use

    3

    here
    File
    APK
    Link
    link
    here
    here

    % of population targeted that received interventions in all cycles of campaign

    HCM-v1.6
    DIGIT-2.9-LTS
    Core service build list
    Project Factory
    Workbench UI
    Microplanning v0.1
    Plan Service
    Resource Generator
    Census Service
    Configs
    Logo

    Release Checklist

    Checklist

    Yes/No/Partially

    Reference Link/ETA

    Owner

    Reviewer

    Remarks

    The development is complete for all the features that are part of the release.

    Yes

    Test cases are documented by the QA team, reviewed by product owners, and test results are updated in the test cases sheet.

    Yes

    Link

    Lata Naik

    Pritish Rath

    The incremental demo of the features showcased during the sprint showcase and feedback is incorporated. If possible, list out the JIRA tickets for feedback.

    Yes

    12-June-24

    Kanishq Bhatnagar Naveen J

    UI/UX audit review is completed along with feedback incorporation for any changes in UI/UX.

    Yes

    30-May-24

    Naveen J

    Andrew Jones

    Mail has been communicated to Andrew Jones for UI/UX audit

    QA sign-off is completed by the QA team and communicated to product owners. All the tickets’ QA sign-off status is updated in JIRA.

    Yes

    Link

    Lata

    Kaviyarasan P

    UI, and API technical documents are updated for the release along with the configuration documents.

    Yes

    Link

    Ramkrishna Sahoo

    Mihika Basu

    UAT promotion and regression testing from the QA team is completed. The QA team has shared the UAT regression test cases with the product owners.

    Yes

    Link

    Lata

    Abhishek Suresh

    The API backward compatibility testing is completed.

    Yes

    Lata Naik

    Kaviyarasan P

    No breaking changes are made.

    The communication is shared with product owners for the completion of UAT promotion and regression by the QA team. The product owners have to give a product sign-off within one week of this communication.

    Yes

    4-June 24

    Lata Naik

    Pritish Rath

    As part of admin console product owner sign-off has been completed

    The UAT product sign-off communication is received from product owners along with the release notes and user guides (if applicable).

    Yes

    20-June-24

    Abhishek Suresh

    Ranjani Rajagopalan

    As part of admin console product owner sign-off has been completed

    The GIT tags and releases are created for the code changes for the release.

    Yes

    Link

    Kanishq Bhatnagar, Naveen J

    Kaviyarasan P

    Verify whether the release notes are updated.

    Yes

    Link

    Naveen J Kaviyarasan P

    Pritish Rath

    Verify whether all the UAT builds are updated along with the GIT tag details.

    Yes

    Link

    Lata

    Kaviyarasan P

    Verify whether all MDMS, configurations, infra-ops configurations are updated.

    Yes

    Release tag,

    API Postman

    Kanishq Bhatnagar Ramkrishna Sahoo

    Kaviyarasan P

    Verify whether all docs will be published to http://health.digit.org by the Technical Writer as part of the release.

    Partially

    Mihika Basu

    Verify whether all test cases are up-to-date and updated along with the necessary permissions to view the test cases sheet. The test cases sheet is verified by the test lead.

    Yes

    HCM v1.5 Test cases

    Lata Naik

    Pritish Rath

    Verify whether the UAT credentials' sheet is updated with the details of new users and roles, if any.

    Yes

    Link

    Lata Naik

    Abhishek Suresh

    Verify whether all the localisation data was added in UAT, and updated in the release kits.

    Yes

    Link

    Lata Naik

    No functional changes were made

    Verify whether the product release notes and user guides are updated and published.

    No

    Abhishek Suresh

    No product functional changes were made

    The demo of the released features is done by the product team as part of a sprint/release showcase.

    Yes

    20-June-24

    Naveen J Kaviyarasan P

    Abhishek Suresh

    Demo has been give as a part of the HCM Console release

    Technical and product workshops/demos are conducted by the engineering and product teams respectively to the implementation team (implementation handover).

    Yes

    Naveen J Kaviyarasan P

    Ankit Sharma

    Architect sign-off and technical quality report.

    Yes

    Kaviyarasan P

    Kaviyarasan P

    Verify Bug Bash has been completed

    Yes

    31-May-24

    Lata Naik

    Pritish Rath

    Gate 2

    21-Jun-24

    The internal release communication along with all the release artefacts are shared by the engineering/ product teams.

    Link
    Naveen J
    Kaviyarasan P

    Release Checklist

    Checklist

    Yes/No/Partially

    Reference Link/ETA

    Owner

    Reviewer

    Remarks

    The development is complete for all the features that are part of the release.

    Yes

    Test cases are documented by the QA team, reviewed by product owners, and test results are updated in the test cases sheet.

    Yes

    Release Checklist

    Checklist

    Yes/No/Partially

    Reference Link/ETA

    Owner

    Reviewer

    Remarks

    The development is complete for all the features that are part of the release.

    Yes

    Test cases are documented by the QA team, reviewed by product owners, and test results are updated in the test cases sheet.

    Yes

    Service Build Updates

    Category (Tag)
    Services
    Docker Artifact ID
    Remarks

    Link

    Lata Naik

    Pritish Rath

    The incremental demo of the features showcased during the sprint showcase and feedback is incorporated. If possible, list out the JIRA tickets for feedback.

    Yes

    23-July-24 29-July-24 06-Aug-24 25-Sept-24

    Kanishq Bhatnagar Naveen J

    UI/UX audit review is completed along with feedback incorporation for any changes in UI/UX.

    Yes

    23-July-24

    Naveen J

    Andrew Jones

    Mail has been communicated to Andrew Jones for UI/UX audit

    QA sign-off is completed by the QA team and communicated to product owners. All the tickets’ QA sign-off status is updated in JIRA.

    Yes

    • DSS Dashboard (IRS) Release

    • HCM-v1.5 (IRS) Release

    Lata

    Kaviyarasan P

    UI, and API technical documents are updated for the release along with the configuration documents.

    Yes

    Link

    Ramkrishna Sahoo

    Mihika Basu

    UAT promotion and regression testing from the QA team is completed. The QA team has shared the UAT regression test cases with the product owners.

    Yes

    Link

    Lata

    Abhishek Suresh

    The API backward compatibility testing is completed.

    Yes

    Lata Naik

    Kaviyarasan P

    No breaking changes are made.

    The communication is shared with product owners for the completion of UAT promotion and regression by the QA team. The product owners have to give a product sign-off within one week of this communication.

    Yes

    4-June 24

    Lata Naik

    Pritish Rath

    As part of admin console product owner sign-off has been completed

    The UAT product sign-off communication is received from product owners along with the release notes and user guides (if applicable).

    Yes

    20-June-24

    Abhishek Suresh

    Ranjani Rajagopalan

    As part of admin console product owner sign-off has been completed

    The GIT tags and releases are created for the code changes for the release.

    Yes

    https://github.com/egovernments/health-campaign-field-worker-app/releases/tag/v1.5.0

    Kanishq Bhatnagar, Naveen J

    Kaviyarasan P

    Verify whether the release notes are updated.

    Yes

    Link

    Naveen J Kaviyarasan P

    Pritish Rath

    Verify whether all the UAT builds are updated along with the GIT tag details.

    Yes

    Link

    Lata

    Kaviyarasan P

    Verify whether all MDMS, configurations, infra-ops configurations are updated.

    Yes

    Release tag,

    API Postman

    Kanishq Bhatnagar Ramkrishna Sahoo

    Kaviyarasan P

    Verify whether all docs will be published to http://health.digit.org by the Technical Writer as part of the release.

    Partially

    Mihika Basu

    Verify whether all test cases are up-to-date and updated along with the necessary permissions to view the test cases sheet. The test cases sheet is verified by the test lead.

    Yes

    HCM V1.5 Test Cases HCM V1.5 Dashboard Test Cases

    Lata Naik

    Pritish Rath

    Verify whether the UAT credentials' sheet is updated with the details of new users and roles, if any.

    Yes

    Link

    Lata Naik

    Abhishek Suresh

    Verify whether all the localisation data was added in UAT, and updated in the release kits.

    Yes

    Link

    Lata Naik

    No functional changes were made

    Verify whether the product release notes and user guides are updated and published.

    No

    Abhishek Suresh

    No product functional changes were made

    The demo of the released features is done by the product team as part of a sprint/release showcase.

    No

    Naveen J Kaviyarasan P

    Abhishek Suresh

    Demo has been give as a part of the HCM Console release

    Technical and product workshops/demos are conducted by the engineering and product teams respectively to the implementation team (implementation handover).

    Yes

    Naveen J Kaviyarasan P

    Ankit Sharma

    Architect sign-off and technical quality report.

    Yes

    Kaviyarasan P

    Kaviyarasan P

    Verify Bug Bash has been completed

    No

    Gate 2

    No

    The internal release communication along with all the release artefacts are shared by the engineering/ product teams.

    Yes

    DSS Dashboard (IRS) Release
    HCM-v1.5 (IRS) Release
    Naveen J
    Kaviyarasan P

    Not changed

    Encryption service

    egov-enc-service-db:v1.1.2-72f8a8f87b-9

    Not changed

    File store

    egovio/egov-filestore:v1.2.4-72f8a8f87b-10

    Not changed

    Localisation

    egov-localization-db:v1.1.3-72f8a8f87b-6

    Not changed

    ID Gen

    egov-idgen-db:v1.2.3-72f8a8f87b-7

    Not changed

    Indexer

    egov-indexer-db:v1.1.7-f52184e6ba-25

    Not changed

    Location

    egov-location-db:v1.1.5-f9271c8-7

    Not changed

    MDMS

    egov-mdms-service:v1.3.2-72f8a8f87b-12

    Not changed

    Notification mail

    egov-notification-mail:health-digit-master-6865af2823-2

    Not changed

    Notification SMS

    egovio/egov-notification-sms:v1.1.3-48a03ad7bb-10

    Not changed

    OTP

    egov-otp-db:v1.2.2-72f8a8f87b-12

    Not changed

    Persister

    egov-persister:v1.1.5-3371bc2-5

    Not changed

    Searcher

    egovio/egov-searcher:v1.1.5-72f8a8f87b-16

    Not changed

    URL shortening

    egov-url-shortening-db:v1.1.2-1715164454-3

    Not changed

    User

    egov-user-db:health-digit-dev-f2ddde9-32

    Not changed

    User OTP

    egovio/user-otp:health-digit-master-6865af2823-3

    Not changed

    Workflow

    egov-workflow-v2-db:v1.2.1-df98ec3c35-2

    Not changed

    Report

    egovio/report:v1.3.4-96b24b0d72-16

    Not changed

    Document uploader

    egov-document-uploader-db:v1.1.0-75d461a4d2-4

    Not changed

    Audit service

    audit-service:audit-heatlh-40b1a4018a-1

    Not chnaged

    Error handler

    error-handler:master-impel-dump-5022b7acff-1

    dashboard-analytics

    dashboard-analytics:master-impel-f705ac483a-48

    dashboard-ingest

    dashboard-ingest:v1.1.4-72f8a8f87b-10

    Health

    Individual

    egovio/individual:v1.1.3-69baa2050a-190

    Changed

    Household

    egovio/household:v1.1.1-b78923bee4-103

    Not changed

    Facility

    egovio/facility:v1.1.0-73167482a2-28

    Not changed

    Product

    egovio/product:v1.1.0-73167482a2-12

    Not changed

    Project

    egovio/project:v1.1.2-69baa2050a-199

    Changed

    Stock

    egovio/stock:v1.1.2-69baa2050a-87

    Changed

    Referral management

    egovio/referralmanagement:v1.0.1-69baa2050a-105

    Changed

    Service request

    egovio/service-request:v1.0.0-a51bee1435-7

    Not changed

    Transformer

    egovio/transformer:v1.1.0-73167482a2-38

    Not changed

    Complaints

    pgr-services:v1.1.7-f58e5abb0d-8

    Not changed

    User management

    egov-hrms:v1.2.6-ac8c591238-4

    Changed

    Attendance

    attendance:v1.0.0-2c51c532-54

    Changed

    MDMS

    Config

    Devops

    Localisation

    Core

    Access control

    egov-accesscontrol:v1.1.3-72f8a8f87b-24

    QA test case SMC Dashboard Admin Console v0.3 Microplanning API Micro Planning UI

    Pritish Rath

    The incremental demo of the features showcased during the sprint showcase and feedback is incorporated. If possible, list out the JIRA tickets for feedback.

    Yes

    23-July-24 Incremental Handover of SMC Dashboard Wednesday, November 27⋅5:30 – 6:15pm

    06-Aug-24

    SMC Dashboard:: Incremental Demo with Product managers Friday, November 29⋅4:30 – 5:30pm

    UI/UX audit review is completed along with feedback incorporation for any changes in UI/UX.

    Yes

    Admin Console 13-Dec-2024 Microplanning 13-Dec-2024

    Andrew Jones

    Andrew Jones have given Signoff

    QA sign-off is completed by the QA team and communicated to product owners. All the tickets’ QA sign-off status is updated in JIRA.

    Yes

    SMC Dashboard Admin Console v0.3 Microplanning v0.1

    Kaviyarasan P

    UI, and API technical documents are updated for the release along with the configuration documents.

    Yes

    SMC Dashboard Admin Console v0.3 Microplanning v0.1

    Mihika Basu

    UAT promotion and regression testing from the QA team is completed. The QA team has shared the UAT regression test cases with the product owners.

    Yes

    Regression Test Cases

    Abhishek Suresh

    The API backward compatibility testing is completed.

    Yes

    Kaviyarasan

    Ongoing Testing

    The communication is shared with product owners for the completion of UAT promotion and regression by the QA team. The product owners have to give a product sign-off within one week of this communication.

    Yes

    SMC Dashboard

    11-Dec-2024

    Micro Planning v0.1

    12-Dec-2024

    Admin Console v0.3

    27-Nov-2024

    Pritish Rath

    As part of admin console product owner sign-off has been completed

    The UAT product sign-off communication is received from product owners along with the release notes and user guides (if applicable).

    Yes

    Admin Console v0.3

    13-Dec-2024

    SMC Dashboard

    13-Dec-2024 Microplanning v0.1 15-Dec-2024

    Abhishek Suresh

    Ranjani Rajagopalan

    As part of admin console product owner sign-off has been completed

    The GIT tags and releases are created for the code changes for the release.

    Yes

    Admin Console v0.3 Microplanning v0.1 SMC Dashboard HCM App

    Kaviyarasan P

    Verify whether the release notes are updated.

    Yes

    SMC Dashboard Admin Console v0.3 Microplanning v0.1

    Naveen J Kaviyarasan P

    Pritish Rath

    Verify whether all the UAT builds are updated along with the GIT tag details.

    Yes

    SMC Dashboard Admin Console v0.3 Microplanning v0.1

    Kaviyarasan P

    Verify whether all MDMS, configurations, infra-ops configurations are updated.

    Yes

    Release tag,

    API Postman

    Ramkrishna Sahoo

    Kaviyarasan P

    Verify whether all docs will be published to http://health.digit.org by the Technical Writer as part of the release.

    Partially

    Mihika Basu

    Verify whether all test cases are up-to-date and updated along with the necessary permissions to view the test cases sheet. The test cases sheet is verified by the test lead.

    Yes

    Admin Console v0.3

    Micro planning API Microplanning UI

    SMC Dashboard

    Lata Naik

    Pritish Rath

    Verify whether the UAT credentials' sheet is updated with the details of new users and roles, if any.

    Yes

    User Credentials

    Lata Naik

    Abhishek Suresh

    Verify whether all the localisation data was added in UAT, and updated in the release kits.

    Yes

    Admin Console v0.3

    Microplanning v0.1

    Lata Naik

    No functional changes were made

    Verify whether the product release notes and user guides are updated and published.

    Yes

    Abhishek Suresh

    No product functional changes were made

    The demo of the released features is done by the product team as part of a sprint/release showcase.

    Yes

    Naveen J Kaviyarasan P

    Abhishek Suresh

    Several Demos have been given to Solutions team and PO for all Projects of HCM v1.6

    Technical and product workshops/demos are conducted by the engineering and product teams respectively to the implementation team (implementation handover).

    Yes

    Naveen J Kaviyarasan P

    Ankit Sharma

    Several Demos have been given to Solutions team and PO for all Projects of HCM v1.6

    Architect sign-off and technical quality report.

    Yes

    Kaviyarasan P

    Kaviyarasan P

    Verify Bug Bash has been completed

    Yes

    Admin Console v0.3-29-Nov-2024 Microplanning 6-Dec-2024

    Gate 2

    Yes

    16th Dec

    The internal release communication along with all the release artefacts are shared by the engineering/ product teams.

    Yes

    SMC Improvements
    SMC Dashboard
    HCM Console v0.3
    Microplanning v0.1
    Kaviyarasan P
    v1.3
    HCM-v1.3
    HCM-v1.3
    HCM-v1.3
    HCM-v1.3
    HCM-v1.3
    Naveen J
    Naveen J
    Naveen J
    Naveen J
    Jagankumar
    Jagankumar
    Jagankumar
    Jagankumar
    Shashwat Mishra
    Shashwat Mishra
    Shashwat Mishra
    Shashwat Mishra
    Ramkrishna Sahoo
    Ramkrishna Sahoo
    Ramkrishna Sahoo
    Shreya Kumar
    Shreya Kumar
    Shreya Kumar
    Shreya Kumar
    Shreya Kumar
    Lata Naik
    Lata Naik
    Lata Naik
    Lata Naik
    Lata Naik
    Lata Naik
    Lata Naik
    HCM Console v0.3
    Anuraj Sinha
    Anuraj Sinha
    Anuraj Sinha
    Anuraj Sinha
    Anuraj Sinha
    Anuraj Sinha
    satya.lanka
    satya.lanka
    satya.lanka
    satya.lanka
    satya.lanka
    satya.lanka