DIGIT Docs
v0.3
  • DIGIT Knowledge Base
  • Local Governance
v0.3
  • Introducing HCM Console
  • Release Notes
    • v0.3: Release Notes
      • v0.3 Technical Release Summary
      • Service Build Updates
      • Master Data Management Service (MDMS) & Configuration Updates
      • HCM Console Test Cases V0.3
      • Gate 2 Release Checklist
        • Release Showcase
    • v0.2: Release Notes
      • v0.2 Technical Release Summary
      • Service Build Updates
      • Master Data Management Service (MDMS) & Configuration Updates
    • v0.1: Release Notes
      • v0.1 Technical Release Summary
      • Service Build Updates
      • Master Data Management Service (MDMS) & Configuration Updates
      • Gate 2 Release Checklist
  • PRODUCT SPECIFICATION
    • User Manual
    • Product Requirement Document (PRD)
    • Functional Specifications
  • TECHNOLOGY
    • Architecture
      • High Level Design
        • Project Factory
      • Low Level Design
        • Project Factory (Campaign Manager)
          • Create Campaign
          • Update Campaign
          • Manage Resources
        • Admin Console
          • Campaign Creation Flow
          • Campaign Updation Flow
          • Checklist Management
      • Services
        • Project Factory
          • Manage Campaign APIs
            • Microplan Integration
            • Update an Ongoing Campaign
          • Manage Data APIs
            • Target Upload
          • Manage Boundary APIs
            • Boundary Generation
            • Boundary Management
            • Boundary Management Through GeoJson
        • HCM Console Web
          • User Interface Design
          • Manage Campaign
            • Setup Campaign (New Campaign)
              • Campaign Details
              • Boundary Details
              • Delivery Details
              • Resource Upload Details
              • Summary Screen
              • Setup Campaign from Microplan
              • Setup and Implementation of Campaign
              • IRS Console Support
            • My Campaign
              • My Campaign Actions
              • Campaign Timeline
              • Update Campaign (Boundary/ Resources)
              • Update Campaign Dates
          • Boundary Data Management
          • Manage Checklist
            • Default Templates
  • SETUP
    • Installation
    • Configuration
      • UI Configurations
      • Steps to Enable a New Campaign Type in Console
      • Advanced Configurations
    • Quality Assurance Testing
      • Automation - Run HCM Console Script
        • User
        • Target
        • Facility
      • Performance Testing
  • GENERAL
    • Product Roadmap
Powered by GitBook

All content on this page by eGov Foundation is licensed under a Creative Commons Attribution 4.0 International License.

On this page
  • Overview
  • Summary
  • My Campaign
  • File Path:
  • API Details

Was this helpful?

Export as PDF
  1. TECHNOLOGY
  2. Architecture
  3. Services
  4. HCM Console Web
  5. Manage Campaign
  6. My Campaign

Campaign Timeline

PreviousMy Campaign ActionsNextUpdate Campaign (Boundary/ Resources)

Last updated 5 months ago

Was this helpful?

Overview

The timeline provides a visual representation of the campaign creation process. It can be accessed from the summary or through the action button on the "My Campaign" screen. The timeline will be shown for ongoing, upcoming, completed, and failed campaigns.

Summary

This timeline shows all the stages of the campaign that are successfully created. A user can download the user credentials as soon as the campaign is created successfully.

The above images show all three timeline steps: upcoming, current, and completed.

My Campaign

A user can also access the timeline from the "My Campaign" screen by clicking on the action button present in the search result.

The timeline will be shown as a pop-up from the "My Campaign" screen. Similar to the summary, while the campaign creation is in progress, it will display all the steps such as upcoming, current, and completed. User credentials will be downloaded once the campaign is successfully created.

File Path:

API Details

End point
Method
Params

/project-factory/v1/project-type/getProcessTrack

POST

params: { campaignId: campaignId, },

https://github.com/egovernments/DIGIT-Frontend/blob/campaign/micro-ui/web/micro-ui-internals/packages/modules/campaign-manager/src/components/TimelineComponent.js
Timeline In summary page
Timeline in my campaign