TheSewerage Calculator Service is used for creating meter readings, searching meter readings, updating existing meter readings, calculating sewerage charges, demand generation, SMS & email notification to ULB officials on-demand generation and estimation of sewerage charges on basis of meter reading for existing sewerage application until the application is disconnected.
Configuration Details
MDMS Configuration
There are no additional billing slabs to be configured for sewerage disconnection, the calculation happens with the meter reading if added and uses existing billing slabs.
Billing Slabs
Criteria
connection type
building type
calculation attribute
property usage type
The combination of the above can be used to define the billing slab. Billing Slab is defined in MDMS under ws-services-calculation folder with the WCBillingSlab. The following is the sample slab (Same as the water connection).
For the disconnection application fee, the estimation will return all the related tax heads based on the criteria.
Following are the exemptions and taxes that are calculated:
Form fee
Scrutiny fee
Other charges
Security charges
Tax and cess
Sewerage Disconnection Charge and Tax
The sewerage charge is based on the billing slab, and for sewerage disconnection application charge will be based on the slab and tax based on the master configuration.
Interest
Below is a sample of the master data JSON for interest:
If the fraction is greater than equal to 0.5 the number is rounded up else it’s rounded down. eg: 100.4 will be rounded to 100 while 100.6 will be rounded to 101.
Demand Generation
Whenever _calculate API is called demand is first searched based on the connection no and the demand from and to period. If demand already exists the same demand is updated else new demand is generated with consumer code as connection no and demand from and to a period equal to the financial year start and end period.
In case of the update, if the tax head estimates change, the difference in amount for that tax head is added as new demand detail. For example, if the initial demand has one demand detail with SEWERAGE_CHARGE equal to 120.
After updating if the SEWERAGE_CHARGE increases to 150 we add one more demand detail to account for the increased amount. The demand detail will be updated to:
The disconnection charges will be the addition of both demand details taxAmount and we can generate demand until the workflow is in PENDING_FOR_DISCONNECTION_EXECUTION.
Note: if there is no pending payment when the connection gets approved then the workflow gets updated from PENDING_APPROVAL_FOR_DISCONNECTION to PENDING_FOR_DISCONNECTION_EXECUTION (it skips the payment step in the workflow internally).
Here the disconnection charges will be 120+30 = 150
RoundOff is bill based i.e every time bill is generated round off is adjusted so that the payable amount is the whole number. Individual SW_ROUNDOFF in demand detail can be greater than 0.5 but the sum of all SW_ROUNDOFF will always be less than 0.5.
Final sewerage charges calculation
Final Sewerage Charges = Last Billing Period Amount * Days (Proposed disconnection date - Last Billing Date) / No. of days in last billing period
The additional parameter is being sent in the calculation request for the disconnection application.
disconnectRequest = true if the request is for _calculate API disconnection application.