Only Block Users can update the Penalty Master of a Scheme.
Design & Workflows
Ensure the user selects the correct scheme to modify from the Scheme dropdown.
Edit Existing Penalty master
Click on the Penalty Master configuration you want to Edit/Disable.
Data Points:
Rate -> In percentage 10 means 10%, 20 Means 20% of the water charge configured
Type -> fixed
Amount -> Not required
From FY -> 2023-24
Subtype -> Current Month
Minimum amount -> not required
Flat amount -> not required (it is used for a flat amount of Penalty)
Starting Date -> From the date the penalty ID is applicable
Applicable After days -> days after demand generation the penalty is applicable