Edit Scheme Rate Master

Overview

Only Block Users can update the rate master of a Scheme.

Design & Workflows

Make sure in the dropdown of the block, the user selects the concerned scheme to modify.

Once clicked on “rate master” it will redirect to the rate master screen.

A list of Rate masters can be seen in different configurations -

  1. Residential / non-metered

  2. Residential / metered

  3. Commercial / non-metered (not used in Naljal yet)

  4. Commercial / Metered (not used in Naljal yet)

  5. Public Sector / Non-metered (not used in Naljal yet)

  6. Public sector/ Metered (not used in Naljal yet)

  7. Mixed / Metered (not used in Naljal yet)

  8. Mixed / Non-metered (not used in Naljal yet)

Edit Existing Rate Master

Click on the rate master configuration you want to edit/disable.

Click on edit.

Edit Non-metered Residential Rate

Edit Metered Connection

Data Points

“From” is the starting of unit “To” is end of unit “Rate” is rate defined within that slab

For example if from is 0 and to is 5 and rate is 5 . consumer 3unit than the rate Will be 3*5= 15 rs

Add Rate Master

By default, state configuration is shown in the rate master if no rates are defined for a particular tenant. How to know this

If you try to edit the rate master shown it will throw you an error.

Building Type

Connection Type

Calculation Attributes

Last updated

Was this helpful?